Energy · PRJ-2024-018

River Niger Hydropower Corridor Review

CompleteKogi2024

Three dams. 1,800 megawatts. Hundreds of kilometres of River Niger corridor. In 2024, NUIPO conducted the most comprehensive protection survey of Nigeria's hydropower infrastructure ever undertaken — visiting Kainji, Jebba, and Shiroro in a single 90-day operation.

1,800 MW

Total installed capacity reviewed

3

Dams assessed

90 days

Field survey duration

100%

Recommendations accepted by Ministry

“

"This review proved that systematic assessment, done properly, changes everything. The findings shaped every protection programme that followed."

River Niger Hydropower Corridor Review
Related infrastructure 1
Related infrastructure 2
Related infrastructure 3

Infrastructure photography — Energy sector, Kogi State

Project overview

NUIPO field teams traversed the full River Niger hydropower corridor over a 90-day period, conducting physical inspections of dam structures, intake works, generation halls, and transmission yards at all three facilities. Stakeholder interviews were conducted with dam management staff, security personnel, and river-adjacent communities.

The review produced a standardised Protection Needs Assessment (PNA) for each facility, identifying common vulnerabilities including inadequate access control, ageing perimeter infrastructure, and gaps in CCTV coverage. Cross-facility recommendations were submitted to the Ministry of Power and were accepted in full — a first for a NUIPO-led assessment at this scale.

Key findings

01

Common vulnerabilities across all three dams

All three facilities share the same structural weaknesses: inadequate access control, ageing perimeter fencing, and partial CCTV coverage. A standardised remediation approach is recommended.

02

Jebba most at risk

The Jebba Dam presents the highest risk profile of the three facilities, with the most significant perimeter deficiencies and the closest proximity to a densely populated riverbank community.

03

Community relations require improvement

At two facilities, community-security relations were found to be adversarial, limiting the effectiveness of informal surveillance. A structured community engagement programme is recommended.

04

Recommendations accepted

The Ministry of Power formally accepted all recommendations from the review, committing to a phased implementation beginning with the highest-risk facilities.

Project timeline

Jul 2024
Review commissioned— Ministry of Power and NUIPO agree scope of corridor assessment
Aug 2024
Field teams deployed— NUIPO operatives begin surveys at Kainji
Sep 2024
Jebba and Shiroro— Field assessment expands to remaining two facilities
Oct 2024
Report submitted— Comprehensive review report delivered to Ministry of Power
Nov 2024
Recommendations accepted— Ministry formally accepts all recommendations — review complete

Related projects

Kainji Hydroelectric Dam — Protection Assessment

PRJ-2025-001

Kainji Hydroelectric Dam — Protection Assessment

ActiveNiger
Niger Delta Oil Pipeline Surveillance

PRJ-2025-002

Niger Delta Oil Pipeline Surveillance

ActiveRivers
All projects