Lagos Bridge Infrastructure Audit

ActiveLagos2025

Across Lagos, a silent threat is undermining the city's bridges — individuals using chisels and cutting tools to extract reinforcing steel rods from the pillars and support structures that carry millions of vehicles every week. NUIPO's bridge audit is documenting the full extent of this vandalism and deploying operatives to stop it.

6

Major bridges assessed

38%

CBD ring road below pavement standard

24/7

Patrol coverage at high-risk sites

2

Enforcement protocols established

“

"These are not petty crimes. Removing reinforcing steel from a bridge pillar is an act that could kill thousands of people."

Lagos Bridge Infrastructure Audit
Related infrastructure 1
Related infrastructure 2
Related infrastructure 3

Infrastructure photography — Transportation sector, Lagos State

Project overview

The audit covers the Oshodi Bridge, Carter Bridge, Eko Bridge, Third Mainland Bridge approach roads, and six local government-administered overpasses. Structural engineers from NUIPO's technical division completed condition surveys on all primary structures, documenting evidence of rod extraction and concrete degradation at multiple sites.

Community awareness campaigns have been conducted in the informal settlements beneath several bridges, engaging residents as community protection partners. A joint enforcement protocol with the Lagos State Traffic Management Authority (LASTMA) and the Nigerian Police is now in place for nighttime patrols of bridge underpasses. All structural concerns identified have been submitted to the Lagos State Ministry of Works and Infrastructure.

Key findings

01

Steel rod extraction widespread

Evidence of systematic reinforcing rod extraction was found at four of the six major bridge structures assessed. In two cases, extraction had penetrated to the primary structural core of support pillars.

02

Nighttime operations

All documented extraction activity occurred between 22:00 and 04:00. Existing security presence during these hours was found to be inadequate at five of the six sites.

03

Drainage accelerates degradation

The Airport Express Road, despite recent resurfacing, has inadequate drainage infrastructure that accelerates degradation — compounding the impact of any structural interference.

04

Informal settlements create access

Informal settlements directly beneath three bridge structures create concealment for vandalism operations. Engagement with settlement leaders has begun to establish community watch arrangements.

Project timeline

Dec 2024
Audit commissioned— Lagos State chapter identifies bridge vandalism as priority threat
Jan 2025
Condition surveys begin— Structural engineers conduct initial assessments of all six bridges
Feb 2025
LASTMA protocol agreed— Joint nighttime patrol protocol signed with LASTMA and Police
Mar 2025
Findings submitted— Full audit report delivered to Lagos State Ministry of Works
Jun 2025
Rehabilitation plan expected— Ministry to publish priority rehabilitation schedule

Related projects

Kainji Hydroelectric Dam — Protection Assessment

PRJ-2025-001

Kainji Hydroelectric Dam — Protection Assessment

ActiveNiger
Niger Delta Oil Pipeline Surveillance

PRJ-2025-002

Niger Delta Oil Pipeline Surveillance

ActiveRivers
All projects